After hosing it down outside and cleaning it up, I was anxious to see how some spinning gear would load up. It worked out well. All I have to do is install nine ring bolts so I can keep the rods from jumping around with bungee cords. I think it will work out just fine once I get it bolted onto the truck. Let's just hope the weather calms down a little bit for next week. If not, I'll have to haul a heavier portable rod holder back into the attic next week.

Here's some Pics of it loaded up with spinning gear.